OEM or aftermarket mixer wear parts: compare cost per cubic metre
Compare two mixer wear-part quotes on the same basis: delivered set cost, changeout labour and the concrete output between replacements.

Two suppliers quote for the same set of mixer blades. One price is lower, but neither quote tells you what the blades will cost per cubic metre of concrete. For that, you need three figures: what it costs to put the set into service, how much concrete it produces, and when it comes out.
Compare the same set first
Put both quotes against the same position list. Does each include the left- and right-hand blades, end scrapers and fixings? Is freight included, and to which destination? A quote for castings at the supplier’s works and a delivered price for a complete changeout are different purchases.
Keep the OEM reference and the proposed replacement reference in separate columns. An independent supplier can use the original number to identify the application. Check the quoted material grade and which components the supplier has included for that reference.
Work from one service cycle
Wear cost per m³ = (delivered parts + installation consumables + changeout labour + attributable downtime cost) ÷ concrete output during that set’s service life.
Take output from the production counter at installation and removal. Use the same currency and cost categories for both sets. Where work fits entirely within a planned stop and no production is lost, there is no reason to add a theoretical production loss. Where a stop does interrupt dispatch, use a plant-agreed cost and avoid counting labour twice.
What does the higher-priced set have to deliver?
Suppose an installed set costs $4,800 and lasts 60,000 m³: its wear cost is $0.08/m³. A second set quoted at $6,000 installed would have to reach 75,000 m³ to match it. These figures illustrate the calculation; they are not Sureay prices, service-life figures or expected savings.
That break-even figure is useful even before you change suppliers. If you have no measured result for the second set, enter 75,000 m³ as its trial target rather than treating a sales estimate as an achieved life.
Make the trial useful for the next order
- Record the machine and positions. Comparing a floor tile under the feed with an upper side liner gives a misleading result, even if both use the same alloy.
- Note the operating conditions. Record significant changes in aggregate, recipe and output. For an asphalt pugmill, use a consistent measure such as tonnes rather than cubic metres of concrete.
- Record why the set came out. A planned shutdown, a change of mix and a part reaching its wear limit are different outcomes.
Use this record to compare an OEM offer and an aftermarket offer on their merits. For the parts side of the comparison, start with the concrete mixer wear-parts catalogue and the positions you intend to replace.
Related reading and parts
Get a quote for your mixer
Ask for a like-for-like quote for the same wear positions, quantities and delivery terms.